APEPDCL • Palakonda Division

SC/ST Solar Rooftop (SRT) Portal

Official Role-Based Portal for Division Head (EE), Sub-Division Officers (2 DEEs), 7 Section Officers (AEs), and Solar Contractor (M/s Sadbhav).

🛡️ Role-Based Password Authentication & Zero-Leak RLS Security
Registered Mobile (For OTP): +91 73825•••••
7,919 Total BOQ Services 2 Sub-Divs • 7 Sections • 545 Villages
Official Login Directory

Palakonda Division Hierarchy (Select User ID & Enter Password)

Password Required to Sign In

1. Division Officer Head (Admin & Backend Excel Control)

2. Sub-Divisional Officers (2 Deputy Executive Engineers — Inspect & Enter Section Data)

3. DISCOM Section Officers (Assistant Engineers — Enter Own Section & Re-Inspect)

4. Solar Installation Contractor (Rectification Only — No Section Entry Access)

☀️
APEPDCL Cloud Sync: Local (Click Setup) MNRE Guidelines

SC/ST Solar Rooftop (SRT) Services Portal

📗
ADMIN ONLY • EE/O/PALAKONDA Backend Data Update via Excel

Backend Excel Remarks Data Entry & Instant Upload

Download the official Excel template, enter or update section remarks in Excel at the backend, and upload it here to update the entire portal.

EE & DEE Daily Progress Tracker Real-time Officer Entry & Vendor Rectification Loop

Daily Updated Progress (DISCOM Officers & Vendor Attendance)

Today Officer Remarks

0

By AE & DEE Officers

Total Defects Identified

0

Sent to Vendor Queue

Pending for Vendor Attend

0

Yellow Queue (To Attend)

Vendor Rectified (Attended)

0

Returned to AE Login

Lagging Alert (Poor Progress)

No pending defects logged yet

High Pending Defects

Live Division Status • Report As On Today

Palakonda Division SC/ST Solar Services Summary

Total Target: 7,919 BOQ Services across 7 Operation Sections & 2 Sub-Divisions (Kurupam ITDA & Palakonda).

Service & Photo Vault All Data & Photos Safely Stored

🔍 Search Any Service (SCNO / Consumer Name / Village) — View Complete Defect History & Uploaded Photos

Inspect any service's full lifecycle: AE Defect Remarks, AE Defect Photo, Vendor Rectification Remarks, Vendor Rectification Photo, and Synchronization Status (preserved permanently even after Synchronization).

Total Services

7,919

BOQ Target 100%

Material Dumped

0

At site Stage 1

Under Progress

0

Installation Stage 2

Defects with Vendor

0

Action Required Sadbhav

Rectified (Under Review)

0

AE Review Pending

Pending for Sync

0

Work Completed Stage 3

Synchronised

0

Net-Meter Done Final Stage

MNRE Defect Categories

Distribution of defects reported by AEs

Field QC

Earthing & Base Concreting account for majority of MNRE defects

Section-wise Progress & Defects

Total Services vs Synchronized vs Pending

7 Sections

Section Abstract Comparison Palakonda Division

Live aggregated numbers mapped directly from Division Master Register

Vendor: M/s Sadbhav Infrastructure
Section Name Total BOQ Remarks Entered Material Not Dumped Material Dumped Civil/Defect Pending Earth Pending Pending for Sync Synchronised Action
Detailed Improper Panel Fixing Abstract Sub-Division & Section-Wise Breakdown

Detailed Improper Fixing of Solar Panels & Stage-Wise Abstract (Track Where & What Defects Exist)

Grouped under Deputy Executive Engineer/O/Kurupam ITDA (3 Sections) & Deputy Executive Engineer/O/Palakonda (4 Sections). Click any row to inspect services.

Sub-Division (DEE) Section Name BOQ Stage 1 & 2 Progress Detailed Improper Fixing of Panels (Not as per MNRE Guidelines) Vendor & AE Loop Stage 3 & Final Total Entered
Not Dumped Mat. Dumped Work WIP 1. Shade Area 2. Drip Sheets 3. Improper Earthing 4. Base Concrete 5. Panels Removed 6. Panels Damaged 7. Lighting Arrester 8. ACDB/DCDB Burnt 9. Loose Wiring 10. Inverter Prob 11. Others/Civil Pending Vendor Rectified (To AE) Pending for Sync Synchronised